Damen Shipyards Logo

A great example of complete chain optimization.

Damen Shipyards customer story
Description

The building package didn’t take the regular four, but less than one week.

Headquarters
Gorinchem
Industry
Shipbuilding
graphical divider

For the construction of a work ship, Damen Shipyards needed a quality building package. And they needed it fast. The construction, which took place in Sweden, had to start as soon as possible and the usual lead times and schedules simple weren’t an option at this point. 

‘This was the first building package that Onepush did for us,’ says Kevin van Doeveren, lead engineer Shipbuilding at Damen Shipyards. ‘I expected our in-house 3D engineering  and Onepush to make a perfect team, shortening the lead times of the design-to-building package process. And wow, did they live up to those expectations.’

The building package didn’t take the regular four, but less than one week. This package was directly cut bij Snijtechniek Brabant, including transport  it took them one week to get the package to the Swedish building floor. Thanks to accurate plates and advanced plate markings by Onepush, the six weeks of building time that was estimated by the Swedish builder, was reduced to a total of three. Impressive, to say the least. All together a great example of complete chain optimization.

“A great example of complete chain optimization. ”
– Kevin van Doeveren, Lead engineer Shipbuilding at Damen

Share this article:

divider graphic

Related Stories

Willems Jachtbouw logo

Willems Jachtbouw

Read Story
Snijtechniek Brabant logo

Snijtechniek Brabant

Read Story
arrow-up icon